If you store research or pharmaceutical materials in a temperature controlled unit, it is imperative that you take action to prevent losses due to equipment malfunctions, power outages, etc. (see Loss Prevention Protocols). A Preventive Maintenance Agreement (PMA) is now required along with an active inventory, continuous monitoring system and identifiable asset or ID tag for all units to be covered by insurance. For questions please refer to the PMA FAQ.
If you have materials stored in temperature controlled units that you would like to have insured, please click the below link. This information must be submitted and reviewed by November 24th.
CLICK HERE TO REVIEW or SUBMIT FREEZER CONTENTS
Thank you for your time and effort to prevent loss of your valuable research and pharmaceuticals.